Silane Transfill Installation

dsc-silane-installation-2

Market

Chemical

Disciplines

Chemical Process Piping Design Mechanical Civil/Structural Electrical + Instrumentation

AED helped design a new silane transfill area for an industrial gas manufacturer to increase production capacity. An upfront evaluation was conducted by AED's Engineering and Construction Management team to determine the most efficient construction execution path (modular versus stick-built). Ultimately, repurposing an existing structure (including HVAC) allowed the site to minimize capital costs and improve the project schedule.

Scope

  • Laser Scanning
  • Detailed Design
  • Architectural Design
  • Construction Management