Benzene Tank Upgrades

Benzene Tank Upgrades

Market

Oil & Gas

Disciplines

Chemical Process
Piping Design
Mechanical
Electrical + Instrumentation

AED provided piping and electrical detailed design services to support tank farm berm improvements for a refinery. The brownfield project required rerouting of existing benzene piping due to the modifications and involved the development of isometrics and piping layout drawings. AED’s electrical team designed a heat trace system for the newly installed piping to prevent the benzene from freezing. Because AED's team was specifically built to be scaled to execute projects of this scope and size, the team was able to execute the project quickly, without error and under budget.

Scope

  • Detailed Design